Today
the holders of the national press and the Catalan, (this not so victorious)
they go full with the great event: the AVE finally arrives to the frontier with
France, this, they say some chronicles, he should insinuate the Catalan
nationalists that better to be together with Spain, because they can already
see as they complete them the projects. Take too much later, this train it
arrives with more than 10 years this train can return late, now no longer to
the center, all that that the center you takes, changing it for I discourage
incomprehension and inefficacy for the whole nation, that is to say for Spain,
and for the disillusioned Catalonia that he goes no longer to use this train to
return, if he doesn't stop to leave.
The
advance of the high speed until the French frontier has needed of more than one
decade to be completed. In 2003 it arrived to Lleida, three years later to Tarragona
and he didn't go up to 2008 when it was planted in Barcelona, of where it
didn't happen up to now. Two years later, among so much Catalonia it claimed
and he didn't understand because the Spanish state retained an and another time
the only high-speed strong line with a profitability assured in its
exploitation, Madrid Barcelona Europe, while it wasted economic efforts in
incongruous high-speed journeys for its distance, its occupation, in definitive
because alone was good to win votes in electoral campaigns.
The
train like I say it arrives too much afternoon, and also incomplete, with what
is clear that the thing continues equally, the train arrives poor and
unfinished, it is like a new political charity, to see if these blissful
Catalan remain silent once and for all, there is not load corridor, you doesn't
arrive to europa with a Spanish train, it is necessary to lower and to catch
one European, French in this case. There is not completed the projected
stations neither in Barcelona neither in Gerona, and I tell them that if there
are not in these moments a coalition independent in the Generality of Catalonia,
this train has not still arrived.
Now
like he said before, this alone train will make a single sense that of going it
won't get any turn trip, I refer from Catalonia toward Madrid clearing it is,
like they are justified these last 10 lost years after seeing the economic
result of the line Madrid Barcelona that I also arrive with a delay of more
than other 10 years, this alone it demonstrates that the distance between
Madrid and Catalonia is every bigger time, because for what seems, to Spain
every time he finds difficult more to arrive to Catalonia, so much so that at
the end the reality seems that it is not that Catalonia wants to become
independent of Spain, it is that it is this the one that becomes independent
every time but of Catalonia.
Very
anyway today he plays to greet from the platform and to their step for their
journey to this new high-speed train, Madrid - Catalonia – Europe, that although
he doesn't have turn trip for Madrid, if maybe it can maintain in march a
communication line between Catalonia and Madrid that if it is not good to
return to after, if maybe it is good to outline a future of union of interests
that it can page the desires of some with the fears of the other ones who he
knows the AVE equally inaugurated today it accelerates the corridor
definitively Mediterranean for goods, and it unites Spain with Europe in
something more than the alarming economic numbers that Spain doesn't want to
present to the Europe of the Euro.
No hay comentarios:
Publicar un comentario